AIRCRAFT PROJECTS

Civil aircraft

SSJ 100

New-generation short-haul narrow-body jets. Deliveries started in 2011.

Major focus areas and progress made
in 2017:
• SSJ 100 deliveries under the established
manufacturing programme: 30 new aircraft
delivered;
• New operational leasing agreements for 20
jets signed with PJSC Aeroflot.
Near-term priorities:
• Ensuring the deliveries of SSJ 100 in
line with the established manufacturing
programme;
• Adopting a programme for the development
of the SSJ 100 family;
• Designing an aircraft version with a seating
capacity of 75 passengers. In April 2018
S7 Airlines signed a letter of intent for 50
SSJ 100s with a seating capacity of 75
passengers.

МС-21

A family of next generation medium-haul narrow-body aircraft that targets the most massive segment of the global market. First deliveries are scheduled for 2019.

Major focus areas and progress made
in 2017:
• Maiden flight and start of flight tests;
• Launch of the aggregate assembly and
final assembly plants, completion of preproduction
engineering prior to serial
production;
• PJSC Aeroflot signed operational leasing
agreements for 50 aircraft.
Near-term priorities:
• Obtaining certification;
• Launching serial production.

Civil aircraft

CR929

Wide-body aircraft using advanced technical solutions

Major focus areas and progress made
in 2017:
• Gate 2 results approved;
• The CRAIC joint venture established with
COMAC;
• Launch of corporate Masters’ Degree
programmes in Composite Structural
Design Engineering and Product Life Cycle
Management Technologies in cooperation
with the Moscow Aviation Institute and the
Shanghai Jiao Tong University.
Near-term priorities:
• Agreeing with COMAC on the responsibility
assignment matrix.

Il-96-400М

Modernised long-haul passenger aircraft

Major focus areas and progress made
in 2017:
• R&D contract signed for the development of
Il-96-400M.
Near-term priorities:
• Preparing design documentation.

Military aircraft

Su-57

Fifth-generation multifunction aircraft

Major focus areas and progress made
in 2017:
• Flight tests under the GSI-1 programme
(State System for Ensuring the Uniformity of
Measurements).
Near-term priorities:
• Obtaining the Certificate of State Joint
Testing.

MiG-35

Generation 4++ multifunction fighter aircraft

Major focus areas and progress made
in 2017:
• World premiere of the MiG-35 aircraft at the
production facility in Lukhovitsy (Moscow
Region);
• Prototype MiG-35S/UB prepared for state
joint testing.
Near-term priorities:
• Signing contracts for the supply of the
aircraft.

Military aircraft

PAK DA

Advanced long-range aircraft

Major focus areas and progress made in
2017:
• State R&D contract signed;
• R&D roll-out.

Tu-160

Long-haul strategic missilecarrying bomber

Major focus areas and progress made
in 2017:
• The first aircraft built as part of the Tu-160
reproduction programme was rolled out at
the Kazan Aviation Plant;
• The contract was signed for the serial
production of Tu-160M.
Near-term priorities:
• Conducting the maiden flight of the new
Tu-160;
• Conducting flight tests.

Transport and special-purpose aircraft

Il-112V

Light military transport aircraft

Major focus areas and progress made
in 2017:
• The integrated schedule for preparing the
first flight of IL-112V was approved by the
President of PJSC UAC.
Near-term priorities:
• Completing the final assembly of an Il-112V
unit to be used in endurance/static tests;
• Completing the final assembly
of a prototype Il-112V.

Be-200 ChS

Amphibious aircraft for use in search and rescue operations

Major focus areas and progress made
in 2017:
• The first Be-200s serially produced at the
Taganrog Aviation Scientific and Technical
Complex were delivered to the customer—
the Russian Ministry of Emergency
Situations (3 aircraft in the reporting year).
Next

Innovation, research and development

Structure
Scroll to top